New Delhi: The Airports Authority of India (AAI) said on Wednesday that it is constructing a new integrated terminal building at the Port Blair airport and it will be ready by mid-2021.
![Port Blair airport to get new integrated terminal building by mid-2021](https://etvbharatimages.akamaized.net/etvbharat/prod-images/8823690_b.jpg)
The airport currently handles around 18 lakh passengers annually, said the AAI, adding that the new terminal building will be able to handle about 50 lakh passengers per annum.
![Port Blair airport to get new integrated terminal building by mid-2021](https://etvbharatimages.akamaized.net/etvbharat/prod-images/8823690_x.jpg)
"More than 65 per cent of project work is completed and the new terminal building of Port Blair is scheduled to be ready by the middle of the next year," the AAI said in a press release.
Read:| AAI to invest Rs 25,000 crore on infra upgradation: Chairman Arvind Singh
The new passenger terminal building will have three-levels comprising lower ground, upper ground and first floor, the AAI noted.
![Port Blair airport to get new integrated terminal building by mid-2021](https://etvbharatimages.akamaized.net/etvbharat/prod-images/8823690_d.jpg)
"The lower ground floor will be used as a remote arrival, departure and service area, the upper ground floor will have an entry gate for departure passengers and exit gate for arrival passengers and the first floor (will be used) as a lounge for international passengers," the AAI stated.
![Port Blair airport to get new integrated terminal building by mid-2021](https://etvbharatimages.akamaized.net/etvbharat/prod-images/8823690_s.jpg)
"Considering the surge in the passenger traffic, the AAI has undertaken the work for construction of the new integrated terminal building at the cost of Rs 700 crore," it mentioned.
Inspired by nature, the design of the terminal is a shell-shaped structure depicting sea and islands, stated the AAI.
PTI report
Read:| AAI building new terminal at Leh airport to handle 20 lakh passengers annually