Srinagar: Northern Railways resumed train services on Sunday after heavy spells of snow disrupted it for a day on Saturday in the Valley. The railways is maintaining additional caution this time to avert any snow-induced snag.
The early morning train in the Banihal-Baramulla rote was delayed by an hour from its scheduled departure at 7 am. Over five trains ply in the Baramulla-Sangaldan route daily. The train service is availed by thousands of passengers who commute daily for jobs, work and other employment between districts and towns.
According to officials, due to restrictions on speed, trains are running behind their scheduled time. The 135-kilometre Banihal-Baramulla track is covered by a thick layer of snow while the accumulation of snow in the Banihal-Sangaldan route is comparatively thinner.
To clear snow off the tracks, the railways deploys men and machinery so that trains don't slip off the track or the line does not come off its track due to heavy moisture and softening of the track surface. Last year, one of the trains had skidded off the track in Mazhama, injuring many passengers. To avoid similar mishaps, the railways now acts with more caution.
"Our priority during snowfall is to clear the track at the joints as the derailment is caused mainly by accumulation of snow on them. For thinner layers of snow, we employ trackmen to clear it off manually and use snow-cutters to clear layers of three feet at high altitudes like Qazigund and Banihal," one of the maintenance engineers told ETV Bharat.
The Valley received heavy snowfall from Friday afternoon till Saturday morning which shrouded it in a white blanket. Although snowfall brought relief from sub-zero temperatures and bitter cold after a four-month dry spell, it halted train and flight services for a day, while disrupting road transport.