ETV Bharat / bharat

Railways cancel tender for 44 Vande Bharat trains after Chinese firm bids

Tender for manufacturing 44 high-semi sets of Vande Bharat Express has been cancelled by the Indian Railways. A company with a Chinese partner had put a bid for these trains. The new tender will be floated in a week and the latest 'public procurement' order gives preference to local suppliers.

Railways cancel tender for 44 Vande Matram trains
Railways cancel tender for 44 Vande Matram trains
author img

By

Published : Aug 22, 2020, 7:32 AM IST

New Delhi: Indian Railways on Friday cancelled the tender for the manufacturing of 44 rakes of Train 18, which has been re-christened as Vande Bharat Express. It said that a fresh tender will be floated within a week's time, focusing on Make in India as a Chinese Joint Venture had also applied as a foreign bidder.

The Ministry of Railways in a statement said, "Tender for manufacturing of 44 sets of semi high-speed train set (Vande Bharat) has been cancelled."

"A fresh tender will be floated within a week as per revised public procurement (Preference to Make in India) order," it added.

The decision came after the Chinese joint venture company CRRC Pioneer Electric (India) Private Limited emerged as the only foreign bidder for the global tender floated for manufacturing 44 rakes of Vande Bharat trains.

The Chennai-based Integral Coach Factory (ICF) has invited bids for procurement of electric traction kits for Train 18, the country's first self-propelled train without locomotives.

READ: With Gunners making their own guns, Army's Artillery scripts a success story

Train 18 was manufactured by ICF, which is owned by the Indian Railways, with over 80 per cent indigenous materials and was rolled out in October 2018 amidst much fanfare.

The train was later re-christened as Vande Bharat express and was introduced between New Delhi and Varanasi, Prime Minister Narendra Modi's parliamentary constituency, in February last year. In October 2019, the second Vande Bharat Express train was introduced between New Delhi and Katra.

In November 2019, the railway board gave a go-ahead to ICF to resume manufacturing of the semi high-speed trains. Subsequently, the ICF had called for bids for procuring electric traction kits for 44 train sets. Each set of trains has got 16 coaches.

In December last year, Indian Railways had planned to complete the production of 44 more new rakes on India's 75th Independence day. All the coaches of Vande Bharat Express have a stainless steel car body equipped with automatic doors with sliding footsteps, on-board computers for train control and remote monitoring. The coaches also have a GPS-based audio-visual passenger information system, on-board hotspot WiFi and comfortable seating arrangements.

READ: JEE Main and NEET to be held as per schedule in September: Officials

IANS

New Delhi: Indian Railways on Friday cancelled the tender for the manufacturing of 44 rakes of Train 18, which has been re-christened as Vande Bharat Express. It said that a fresh tender will be floated within a week's time, focusing on Make in India as a Chinese Joint Venture had also applied as a foreign bidder.

The Ministry of Railways in a statement said, "Tender for manufacturing of 44 sets of semi high-speed train set (Vande Bharat) has been cancelled."

"A fresh tender will be floated within a week as per revised public procurement (Preference to Make in India) order," it added.

The decision came after the Chinese joint venture company CRRC Pioneer Electric (India) Private Limited emerged as the only foreign bidder for the global tender floated for manufacturing 44 rakes of Vande Bharat trains.

The Chennai-based Integral Coach Factory (ICF) has invited bids for procurement of electric traction kits for Train 18, the country's first self-propelled train without locomotives.

READ: With Gunners making their own guns, Army's Artillery scripts a success story

Train 18 was manufactured by ICF, which is owned by the Indian Railways, with over 80 per cent indigenous materials and was rolled out in October 2018 amidst much fanfare.

The train was later re-christened as Vande Bharat express and was introduced between New Delhi and Varanasi, Prime Minister Narendra Modi's parliamentary constituency, in February last year. In October 2019, the second Vande Bharat Express train was introduced between New Delhi and Katra.

In November 2019, the railway board gave a go-ahead to ICF to resume manufacturing of the semi high-speed trains. Subsequently, the ICF had called for bids for procuring electric traction kits for 44 train sets. Each set of trains has got 16 coaches.

In December last year, Indian Railways had planned to complete the production of 44 more new rakes on India's 75th Independence day. All the coaches of Vande Bharat Express have a stainless steel car body equipped with automatic doors with sliding footsteps, on-board computers for train control and remote monitoring. The coaches also have a GPS-based audio-visual passenger information system, on-board hotspot WiFi and comfortable seating arrangements.

READ: JEE Main and NEET to be held as per schedule in September: Officials

IANS

ETV Bharat Logo

Copyright © 2024 Ushodaya Enterprises Pvt. Ltd., All Rights Reserved.