ETV Bharat / bharat

Chandrayaan-2 modules getting ready for launch in July: ISRO

ISRO on Wednesday said that Chandrayaan-2, India's second moon mission, will be launched on July 9 and 16 with an expected landing on September 6.

Pic courtesy: Twitter@isro
author img

By

Published : May 1, 2019, 10:29 PM IST

Bengaluru: All modules of India's second moon mission "Chandrayaan-2", scheduled for launch in July, are getting ready and the lander is expected to touch down on the lunar surface in early September, the ISRO said on Wednesday.

"The launch window is from July 9 to July 16 with an expected Moon landing on September 6," the Indian Space Research Organisation (ISRO) said in an update on the mission, which was earlier scheduled for April launch.

An official of the space agency had last week said Chandrayaan-2 mission has been further postponed to July in the backdrop of Israel's unsuccessful attempt to land on Moon. "We saw Israel's example and we don't want to take any risk. Despite Israel being such a technologically advanced country, the mission failed. We want the mission to be a success," he had said.

Earlier, Chandrayaan-2 was scheduled for launch in a window from January-February but ISRO had deferred it to March-April.

In its update Wednesday, the city-headquartered ISRO said the three modules -- Orbiter, Lander (Vikram) and Rover (Pragyan) -- of Chandrayaan-2 were getting ready for July launch.

The Orbiter and Lander modules will be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle. The Rover is housed inside the Lander, it said in a statement.

The integrated module will reach the moon orbit using Orbiter propulsion module after its launch into earth bound orbit by GSLV MK-III.

It might take 35 to 45 days to reach the Moon after the launch.

Subsequently, the lander will separate from the orbiter and soft land at the predetermined site close to lunar South Pole, the space agency said.

The rover will roll out for carrying out scientific experiments on the lunar surface. Instruments would also be mounted on the Lander and Orbiter for carrying out scientific experiments, it said.

The ISRO is cautious about Chandrayaan-2, its first mission to land on any celestial body, as it is wary of failure after Israel's Beresheet spacecraft crashed during moon landing on April 11.

READ: Gen VK Singh urges world to adopt UN Comprehensive Convention

Bengaluru: All modules of India's second moon mission "Chandrayaan-2", scheduled for launch in July, are getting ready and the lander is expected to touch down on the lunar surface in early September, the ISRO said on Wednesday.

"The launch window is from July 9 to July 16 with an expected Moon landing on September 6," the Indian Space Research Organisation (ISRO) said in an update on the mission, which was earlier scheduled for April launch.

An official of the space agency had last week said Chandrayaan-2 mission has been further postponed to July in the backdrop of Israel's unsuccessful attempt to land on Moon. "We saw Israel's example and we don't want to take any risk. Despite Israel being such a technologically advanced country, the mission failed. We want the mission to be a success," he had said.

Earlier, Chandrayaan-2 was scheduled for launch in a window from January-February but ISRO had deferred it to March-April.

In its update Wednesday, the city-headquartered ISRO said the three modules -- Orbiter, Lander (Vikram) and Rover (Pragyan) -- of Chandrayaan-2 were getting ready for July launch.

The Orbiter and Lander modules will be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle. The Rover is housed inside the Lander, it said in a statement.

The integrated module will reach the moon orbit using Orbiter propulsion module after its launch into earth bound orbit by GSLV MK-III.

It might take 35 to 45 days to reach the Moon after the launch.

Subsequently, the lander will separate from the orbiter and soft land at the predetermined site close to lunar South Pole, the space agency said.

The rover will roll out for carrying out scientific experiments on the lunar surface. Instruments would also be mounted on the Lander and Orbiter for carrying out scientific experiments, it said.

The ISRO is cautious about Chandrayaan-2, its first mission to land on any celestial body, as it is wary of failure after Israel's Beresheet spacecraft crashed during moon landing on April 11.

READ: Gen VK Singh urges world to adopt UN Comprehensive Convention

ZCZC
PRI ECO GEN NAT
.BENGALU MDS7
SPACE-CHANDRAYAAN-2
Chandrayaan-2 modules getting ready for launch in July: ISRO
Bengaluru, May 1 (PTI) All modules of India's second
moon mission "Chandrayaan-2", scheduled for launch in July,
are getting ready and the lander is expected to touch down on
the lunar surface in early September, the ISRO said Wednesday.
"The launch window is from July 9 to July 16 with an
expected Moon landing on September 6," the Indian Space
Research Organisation (ISRO) said in an update on the mission,
which was earlier scheduled for April launch.
An official of the space agency had last week said
Chandrayaan-2 mission has been further postponed to July in
the backdrop of Israel's unsuccessful attempt to land on Moon.
"We saw Israel's example and we don't want to take any
risk. Despite Israel being such a technologically advanced
country, the mission failed. We want the mission to be a
success," he had said.
Earlier, Chandrayaan-2 was scheduled for launch in a
window from January-February but ISRO had deferred it to
March-April.
In its update Wednesday, the city-headquartered ISRO
said the three modules -- Orbiter, Lander (Vikram) and Rover
(Pragyan) -- of Chandrayaan-2 were getting ready for July
launch.
The Orbiter and Lander modules will be interfaced
mechanically and stacked together as an integrated module and
accommodated inside the GSLV MK-III launch vehicle. The Rover
is housed inside the Lander, it said in a statement.
The integrated module will reach the moon orbit using
Orbiter propulsion module after its launch into earth bound
orbit by GSLV MK-III.
It might take 35 to 45 days to reach the Moon after the
launch.
Subsequently, the lander will separate from the orbiter
and soft land at the predetermined site close to lunar South
Pole, the space agency said.
The rover will roll out for carrying out scientific
experiments on the lunar surface. Instruments would also be
mounted on the Lander and Orbiter for carrying out scientific
experiments, it said.
The ISRO is cautious about Chandrayaan-2, its first
mission to land on any celestial body, as it is wary of
failure after Israel's Beresheet spacecraft crashed during
moon landing on April 11. PTI GMS
VS
VS
05012037
NNNN

For All Latest Updates

ETV Bharat Logo

Copyright © 2025 Ushodaya Enterprises Pvt. Ltd., All Rights Reserved.