Pithoragarh: Some workers at the construction site claimed that stones were pelted reportedly by the Nepal citizens at the embankment construction site on the banks of River Kali on Sunday. An embankment is being built on the banks of the River Kali from the Indian side for the security of Dharchula city which is costing Rs. 77 crores. The irrigation department is working on the security wall and marine drive from Ghatkhola drain to Khotila.
Earlier, Nepal has raised questions on the construction of the embankment. Nepal has claimed in the past that an embankment is being built by India on their territory. However, the local administration had rejected the claim of Nepal outright.