Hyderabad:Telangana Chief Minister K Chandrasekhar Rao formally inaugurated the Kaleswaram Lift Irrigation Project on Friday.
Chief Ministers of Andhra Pradesh and Maharashtra: Y S Jaganmohan Reddy and Devendra Fadnavis participated in the function. The three CMs switched on three pumps at Kannepalli Pumphouse as a token of the inauguration of the project.
Kaleswaram Lift Irrigation Project is built on River Godavari at Kannepalli village, Mahadevpur Mandal, Jayasankar Bhupalapalli district of Telangana. The project with 45,000 acres of ayacut aims at lift irrigate almost 235 TMC of water from river Godavari. This is the first biggest project taken up after the formation of Telangana state.
Kaleswaram Lift Irrigation Project (KLIP) utilizes only the flood water. Though the project is massive in technical and engineering aspects; land acquisition is very limited because of underground set up like pumping stations, tunnels constructing and usage of existing reservoirs; claims Telangana government.
The World's biggest and largest underground pumping station is built in this project. Simultaneously 81 km long tunnel is nearing to completion between existing Yellampalli barrage and upcoming Mallanna Sagar reservoirs.
Some of the salient features and engineering marvels of this project are: highest pump and motor capacity in the world, each motor capacity 139 MW and total 7 pumps are built, it has the longest tunnel in Asia, biggest surge pool and three new barrages and three pump houses are under construction.