New Delhi: All existing inter-state transmission system lines have been mapped on the portal of the PM GatiShakti National Master Plan which was launched in October, 2021 to push infrastructure development in the country.
"In line with goal of PM GatiShakti, entire existing Inter State Transmission System (ISTS) lines have been mapped on the portal spanning across length and breadth of the country," a power ministry statement said. Also, it informed that the 90 per cent under-construction ISTS lines have been integrated to the portal and the remaining 10 per cent are to be integrated after finalisation of route survey by respective transmission service providers. PM GatiShakti NMP portal will ultimately aid in solving problems of development of infrastructure in the country by building a secure, sustainable, scalable and collaborative approach towards infrastructure planning for seamless connectivity to economic zones, it stated.
Prime Minister Narendra Modi launched PM GatiShakti NMP in October last year with the objective to bring different ministries/utilities and infrastructure planning under a single unified vision across all sectors such as highways, railways, aviation, gas, power transmission, and renewable energy. The PM GatiShakti NMP portal provides "one-click comprehensive view" to steer and simplify the planning and implementation process by reduction of time and cost of implementation in power transmission projects, the statement said. In the development of power transmission projects, the statement said, PM GatiShakti NMP portal shall play a critical role in planning, tendering, implementation and approval stages.