Washington:The US space agency has once again readied its Artemis I moon mission and met all objectives, including the key hydrogen leak threat which has resulted in two failed attempts. After encountering a hydrogen leak early in the loading process with the Space Launch System (SLS), engineers were able to troubleshoot the issue and proceed with the planned activities, NASA said in a statement. The four main objectives for the demonstration included assessing the repair to address the hydrogen leak identified on the previous launch attempt, loading propellants into the rocket's tanks using new procedures, conducting the kick-start bleed, and performing a pre-pressurisation test.
"The liquid hydrogen leak remains manageable during the Artemis I cryogenic demonstration test. Teams warmed up the quick disconnect umbilical line and the leak then maxed out at 3.4 per cent, which is within the acceptable range to continue," NASA said in a tweet. The launch director confirmed all objectives have been met for the cryogenic demonstration test, and teams proceeded with critical preparations for draining the rocket's tanks.