New Delhi: The General-Secretary of Ram Janmbhoomi Teerth Kshetra Trust, Champat Rai on Sunday said that the Ram Temple in Ayodhya is likely to be ready in three years time.
"The Ram Temple will be built in about two and a half acres and a wall will be built around it, which is called Parkota. Retaining walls will be built inside the ground to prevent the effects of floods. This work will be completed in three years and with this preparation we are doing all the work," Rai said.
Earlier in the day while addressing a press conference, Vishwa Hindu Parishad (VHP) national vice-president Rai said that Rajasthan has participated the most in the Samarpan (donation) drive for the construction of Ram Mandir in Ayodhya.
Also read:VHP collects over Rs 2,000 during Ram temple donation drive
"The collective contribution of Jodhpur, Jaipur, and Chittor for the construction of Ram Mandir is Rs 500 crores, which in itself is quite a big deal," Rai said while addressing a press conference.
"We connected to 36,000 villages in Rajasthan where 9 lakh workers were contacted. 38,125 workers were given the responsibility to deposit the money in the bank. The campaign was monitored from 49 centres in India," he added.