Chamoli (Uttarakhand):The soil underneath the highway washed away in the rainwater leading to the caving in of the road. The all-weather highway in Uttarakhand, which was constructed keeping in mind the country's strategic interest also, has failed to withstand this season's first monsoon rainfall. A huge crater has been formed on the Rishikesh-Badrinath stretch of the highway near Purshari. The soil underneath the highway washed away in the rainwater leading to subsidence of the road. The vehicular movement on the highway has come to a grinding halt.
The RCC protection wall on the highway came crashing down thereby leading to erosion of soil underneath the road. Later, the surface of the highway caved in and a huge crater was formed. The top surface of the highway leading up to several yards on the Rishikesh-Badrinath stretch near Purshari was found missing. Virtually there was no road on this portion of the highway.