Varanasi (Uttar Pradesh): A three-member Central team comprising two officials from Varanasi on Monday conducted an on-the-spot inspection of the underconstruction Phulwaria-Lahartara four-lane approach at Imaliyaghat. The cracks have developed on the approach road of the under-construction four-lane highway in the Varuna area of Varanasi.
The Central team comprising local officials stayed at the spot for an hour on Monday to find out the shortcomings, which led to the development of cracks or erosion of soil from underneath the approach road of the highway at Imaliyaghat. Rakesh Singh, joint project director of the Setu Nigam, Ravi Dutta, General Manager, Quality Control, and Santraj, Chief Project Manager, along with two local officials, conducted the spot survey of the highway. Officials during the inspection found that boulders or other reinforcement material were not used by the side of the highway to stop the erosion of the soil. Besides, the concrete wall was also not erected for checking the erosion of the soil.